PE Pipe Extrusion for Water Gas Supply

PE Pipe Extrusion for Water Gas Supply

 PE Pipe extrusion for Water Gasoline Supply 

 plastic PE Pipe extrusion for Drinking water Fuel Supply is made and company by our factory Jaingsu Acemine machinery Co.,Ltd. TheDiameter 50-a hundred and sixty mm PE pipe extrusion machine line can produce the Strong-wall Pipe Extrusion Equipment twin pipe extrusion device line. The feares of this Diameter fifty-a hundred and sixty mm PE pipe extrusion machine line is that thee are two strains for generating the plastic pipe. So the producing capability is big.

The PE Pipe extrusion for Water Gasoline Supply like under elements:
1    CZPT feeder
2    SJZ65/132 twin-screw extruder
3    Mould for drain pipe 
4    Vacuum Calibration tank
5    Haul-off and cutter
6    Stacker

Raw materials & Final product, and Pipe species and size checklist: is as underneath:
Uncooked material & formulation    PVC resin powder & CaCo3, Lubricant Stabilizers Pigments Antioxidants
Description final product    PVC pipe , Pipe Diameter: Ф20-40mm
Output capacity    Max:250kg/h ,   Max haul-off pace:12m/min

The doing work process of the PE Pipe extrusion for Drinking water Fuel Source is as beneath:

two.SJZ65/132 conical twin-screw extruder  of  plastic PE Pipe extrusion for H2o Gasoline Supply CZPT information
Extrusion capacity     200-250kg/h 
Screw    Diameter conical 65/ 132 mm 
Substance of screw: 38CrMoAlA
Surface area treatment method: Alloy and Nitriding processing, thickness: .4 ~ 0,7mm, Sharpening
Rotating pace (counter rotating): 1-36.9RPM
Barrel    Diameter conical sixty five/132
Inner processing: Alloy and Nitrided with thickness: .4 ~ 0.7mm
Heating zones: 4
Heating mode: Solid Aluminum heater coated with stainless steel 
Heating power: 20kw
Cooling method: Blower .37Kw×3sets 
Driving motor    Motor electricity: 37Kw AC   (SIEMENS)
Dosing feeding system    Motor:one.1Kw    CZPT screw compelled feeding 
Vacuum program
    Vacuum pump: 2.2Kw,1 set
Vacuum diploma = 0 ~ 0.075 Mpa
Adaptor
    Material: #40steel Chrome plated40, internal convergent stream type
Relationship strategy with die: clamping block + bolt
Stress melt sensor and thermocouple
Main electric cabinet
    Inverter: ABB Contactor : Schneider Air Change :LS 
Relay: Omron Temperature controller: Omron
Self-protective program
    Over existing protective of motor
Over strain protecting of screw
Outer size and weight     3800×1500×2410mm    2200kg

This is the die mould of the   plastic PE Pipe extrusion for H2o Gasoline Supply.
Like calibration sleeve
Content: Created by 40Cr  Inner area polished
Diameter spec: Ф50 ,75, one hundred ten, 160mm
Wall thickness: Providing by customer
Remark: In accordance to client needs, it is achievable to offer water offer pipe

 plastic PE Pipe extrusion for H2o Gas Provide Vacuum calibration tank is as underneath:
Proportions: Duration: 5600mm  Two chambers
Vacuum pump: 3 KW X 2 Models
Drinking water pump: 4 KW X 2 Units   
Three directions adjustment: 
Ahead and Backward relocating:  motor:one.5Kw
Variety: ±1000mm
Up and down: left and right manually altered
Selection: Up and Down: ±150mm
Leftward and Rightward relocating: ±50mm
Tank material: STAINLESS STEEL 
CZPT cabinet: With water temperature manage program

 plastic PE Pipe extrusion for Drinking water Gas Offer Haul off and cutting  unit  (chain wheel driving)
HAUL-OFF (for Dual pipe):
Impartial handle technique
Haul off unit : 2 claws 
Powerful haul-off size: 1200mm 
Claw width: 80mm 
Maximum hauling speed: 6m/min
Principal motor: 1.5KW X 2 units AC motor ( inverter ABB )

 plastic PE Pipe extrusion for Drinking water Fuel Offer Stacker.
Length depend: coder  
Reducing observed: metal alloy, certain for reducing U-PVC pipe
Outfitted with rubber clamping block for exact reducing
Motor electricity: 1.5KW
Diameter of saw: 400mm
Motor velocity: 2800r/min
Outfitted with a closed dust-collector:With scrap collecting system Chance of handbook procedure

We also offer some spars parts for the  plastic PE Pipe extrusion for Drinking water Gasoline Source.
beneath is the checklist for your reference:
No.    Name    Qty.    Used for
1    Big spanner    1 set    Extruder
2    Oil seal of large-velocity axis of gearbox     1 piece     
3    Nylon pin for axial connector    1 piece    
4    Thermocouple    3 sets    
5    Rubber block      15 pieces    Haul-off
6    Electromagnetic valve    2 pieces    
7    T air linker    5 pieces     
8    Sealing bar     10m    Vacuum tank and spray cooling tank
9    Sprayer    15 sets    
10    Small contactor     2    CZPTal cabinet 
11    Button and switch     2    
12    Relay     2    

Also under is some details of the businees iterms for your reference:
four.1 CZPT documents
All the symbols on the equipments should be in English. Vendor is dependable to supply basic format strategy, electrical strategy, installation course, and manual book in English to Purchaser on time. 
four.2. Arrangement for inspection, set up and testing perform
a. Right after all machines are delivered to customer’s manufacturing unit Customer is dependable for all planning function, e.g. electrical power supply, water provide, labors and cranes, etc.
b. ACEMIEN will get ready for visa application for their engineers, who are dependable for guidebook of device set up and tests at the Buyer’s manufacturing unit.
c. The Purchaser will purchase the round-trip air ticket for Engineer if visa application is authorized. The purchaser is also accountable to bear expenditures generated, e.g. visa formalities, meals, accommodation and allowance of USD60 for each working day for each and every engineer.
d. Engineer will give cost-free training classes to labors in buyer’s manufacturing facility.
e. If consumer will not request installation and commissioning by Seller’s engineer in 4 months given that date of bill of lading, which to be accounted all the machines has been successfully analyzed by purchaser.
four.3. Quantity and quality ensure
a. Quantity/Top quality Discrepancy to vacation spot port during transportation: 
In case of top quality/quantity discrepancy to vacation spot port in transportation, consumer should file claim within 30 days right after the arrival of the goods at port of destination. Insurance business and delivery company will be responsible for any discrepancy of the merchandise brought on by shipping business and other transportation firm and/or put up place of work. 
b. Ensure interval and right after-sales solutions: 12 months since day of invoice of lading
For the duration of this promise period of time, ACEMIEN will offer spare parts CZPT any charge in circumstance of good quality discrepancy caused by us. If the malfunctions are brought on by your incorrect functions, ACEMIEN will provide the customer spare parts at cost value. 
c. Lengthy-time period service:
ACEMIEN will demand the purchaser cost value of spare components over and above a single 12 months and provide long-expression complex guide.
4.4. Validity: Three months considering that quotation date.
We thank you for your inquiry and would be delighted to receive your get quickly.

ZheJiang Acemine Machiney Co.,Ltd is ZheJiang province, China. Our manufacturing facility is professional produce the extrusions for the plastic pipes, the roofing tile machine, the plastic profile .

If you need to have any of the extrusion machines, remember to truly feel free make contact with me, make sure you!

My identify is Karry, remember to really feel cost-free get in touch with me, you should!
Whatsapp: 18913298068
Telephone/ Wechat : 182 0571 135

PE Pipe Extrusion for Water Gas Supply